7Miller R E. Mass blasting techniqqus as practised in lead and copper stopes at Mount ISA Mine Ltd[J] . Australian Inst of Min and Metall, 1978,66 (2) : 125-139.
8Rathore S S. Controlled fracture growth by blasting while protecting damages to remaining rock [ J ] . Rock Mechanics and Rock Engineering, 2007, 40 (3) : 317-326.
9Singh S P. Mechanism of tracer blasting[ J]. Geotechnical and Geological Engineering, 1996, 14(1 ):41-50.
10Brent G F. Detection of blast damage by borehole pressure measurement[J]. Journal of the South African Institute of Mining and Metallurgy, 2000, 100(1): 17-21.