摘要 两河口水电站是中国首座在建300m级砾石土心墙堆石坝,大坝心墙采用砾石土料作为高堆石坝防渗体,其施工质量是本工程的重中之重,大坝心墙施工的重点是砾石土料制备及填筑质量控制。主要介绍了两河口水电站复杂土料场的砾石土料制备方法和措施,实现了砾石土料P5颗粒含量40%~45%的控制目标,保障了施工质量。 Lianghekou Hydropower Station is the first 300 m-class gravel soil core rockfill dam under construction in China.The dam core wall adopts gravel soil as the impervious body of the high rockfill dam.The construction quality of core wall is the top priority of the project.The focus of dam core wall construction is the quality control of gravel soil preparation and embankment.The article introduces the method and engineering measures adopted for preparation of gravel soil in the complex borrow of Lianghekou Hydropower Station which realized the control target of 40%~45% of P 5 particle content in the gravel soil material and guaranteed the construction quality of the project.
作者 魏雄 武波 杨晓鹏 任蒙 WEI Xiong;WU Bo;YANG Xiaopeng;REN Meng(Powerchina Northwest Water Conservancy and Hydropower Engineering Consulting Co.,Ltd.,Xi'an 710061,China)
出处 《西北水电》 2019年第3期61-64,67,共5页 Northwest Hydropower
关键词 两河口水电站 大坝心墙 防渗体 复杂土料场 砾石土料制备 Lianghekou hydropower station dam core wall impervious body complex borrow gravel soil preparation
  • 相关文献

参考文献9

二级参考文献35

共引文献39

同被引文献55

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部