摘要 石鸡水电站2号机B级检修完启动时,下导轴承温度过高不能正常带负荷运行,电站经几次反复调整处理,问题仍没能解决,经分析是旋转中心偏移过多造成电磁力不平衡所至,把轴位调整后问题得到解决,机组带负荷运行正常。 When the No.2 unit of Shiji Hydropower Station is commenced after completion of B-class maintenance, the unit failed to operate with load due to the excessive temperature of the lower guide bearing.After repeated conditioning, the problem still cannot be solved.The analysis shows that the unbalanced electromagnetic force due to excessive offset of the rotation center caused the problem which is solved through adjusting the shaft position, and the unit is running normally with load.
作者 同焕珍 刘秀良 闵占奎 赵炜 党星明 陈柏旭 甄文喜 TONG Huanzhen;LIU Xiuliang;MIN Zhankui;ZHAO Wei;DANG Xingming;CHEN Baixu;ZHEN Wenxi(State Grid Gansu Electric Power Company Electric Power Research Institute,Lanzhou 730070,China;Datang Bikou Hydropower Plant,Wen County,Gansu 746412,China)
出处 《西北水电》 2019年第3期68-71,共4页 Northwest Hydropower
关键词 轴承 温度过高 轴位 调整处理 bearing excessive temperature shaft position conditioning
  • 相关文献

参考文献9

二级参考文献75

共引文献149

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部