黄登水电站地下厂房岩壁吊车梁的设计尺寸和吨位均位于国内前列,其岩壁吊车梁主要按照《地下厂房岩壁吊车梁设计规范》进行设计,并借鉴小湾、糯扎渡等电站岩壁吊车梁设计的成功经验,通过一段时间的运行,证明其结构和锚固设计是合理的。
The design dimension and tonnage of rock-wall crane girders of underground powerhouse in Huangdeng hydropower station are among the top in China. Its design is mainly according to “Design Criterion of Crane Beam on Rock Wall for Underground Powerhouse”. And the successful experience of design of rock-wall crane girders of Xiaowan and Nuozhadu Hydropower Stations is used for reference. Through quite a long period of operation, the structure and anchorage design of the crane girders are proved to be reasonable.
作者
柴余松
CHAI Yu-song(Power China Kunming Engineering Corporation Limited ,Kunming 650051 China)
出处
《云南水力发电》
2019年第3期71-74,共4页
Yunnan Water Power
关键词
黄登水电站
岩壁吊车梁
地质缺陷
岩壁吊车梁监测数据结论
Huangdeng hydropower station
crane girder on rock wall
geologic defect
conclusion of monitoring data