路线交叉处既有公路路基改桥梁设计探讨 被引量:3

Discussion on design of existing subgrade to bridge at intersection of routes
下载PDF
导出
摘要 新建公路与既有公路交叉时,如遇既有公路路基填土高度较高,具备新建公路下穿既有公路条件时,可采用既有公路路基改桥梁方案。主要介绍了既有公路路基改桥梁方案的保通措施、上下部结构设计及施工工序等。 When a new road route crosses an existing road route, the existing Subgrade can be changed into a bridge if the height of the existing Subgrade is relatively high and the conditions for the new road route undercrossing the existing road route are met. This paper mainly introduces the guaranteed access measures, superstructure and substructure design and construction procedure of the existing Subgrade being changed into a bridge.
作者 孙志刚 孙绪锋 刘世臣 SUN Zhi-gang;SUN Xu-feng;LIU Shi-chen(Shandong Provincial Communications Planning and Design Institute,Shandong Jinan 250031 China)
出处 《山东交通科技》 2019年第3期115-117,共3页
关键词 路基改桥梁 保通措施 结构设计 施工工序 the existing subgrade being changed into a bridge guaranteed access measures structure design construction procedure
  • 相关文献

同被引文献9

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部