针对上海临港新城皇冠假日酒店工程较差的地质环境,对其基坑围护选择方案进行了比较和优化,制订了相对应的技术措施,最终取得了理想的实施效果,为今后在临港地区这一特殊土质条件下的类似工程提供了借鉴经验。
In view of the poor geological environment, the comparison and optimization of selection schemes of retaining structure of foundation pit of the Crowne Plaza Hotel project in Shanghai Lingang New Town were carried out, and finally the ideal implementation effect was achieved, which can provide reference experience for similar projects under special soil conditions in Lingang area in the future.
作者
张文军
ZHANG Wenjun(Shanghai Construction No.l(Group)Co.,Ltd.,Shanghai 200120,China)
出处
《建筑施工》
2019年第6期998-1000,共3页
Building Construction
关键词
上海临港地区
基坑围护
方案优化
深层水泥土搅拌桩
Shanghai Lingang area
retaining structure of foundation pit
scheme optimization
deep mixing pile