常州地铁2号线地下车站清水混凝土模板的结构力学性能试验与优化设计 被引量:3

Mechanical Performance Test and Optimization Design of Fair-Faced Concrete Formwork Structure of Underground Station of Changzhou Metro Line 2
下载PDF
导出
摘要 针对常州地铁2号线青洋路站的侧墙模板问题,首先通过对模板结构在施工状态下的荷载响应进行了有限元模拟计算,发现了原设计中存在的缺陷;然后在实际浇筑混凝土的过程中开展模板荷载响应试验,测量了模板的变形数据,从而验证了计算的正确性;最后,采用经验证后的有限元模型对模板结构进行优化设计。研究成果对于进一步完善清水混凝土模板结构设计方法并提高其施工质量具有一定的参考意义。 In view of the side wall formwork problem of Qingyang Road Station of Changzhou Metro Line 2, the finite element simulation calculation of the load response of the formwork structure under construction conditions was carried out firstly, and the defects in the original design were found. Then in the actual concrete pouring process, the load response test of formwork was carried out and the deformation data of the formwork was measured to verify the correctness of the calculation. Finally, the validated finite element model was used to optimize the design of the formwork structure. The research results have certain reference significance for further improving the design method of fair-faced concrete formwork structure and improving its construction quality.
作者 丁胜 DING Sheng(Shanghai Mechanized Construction Group Co., Ltd., Shanghai 200072, China)
出处 《建筑施工》 2019年第6期1095-1098,共4页 Building Construction
关键词 清水混凝土 模板刚度 应变桥盒 设计优化 fair-faced concrete formwork stiffness strain bridge box design optimization
  • 相关文献

参考文献2

二级参考文献2

  • 1中国建筑工程总公司.清水混凝土施工工艺标准[M].北京:中国建筑工业出版社,2005.70-71.
  • 2马卫东.安藤忠雄建筑之旅[M].宁波:宁波出版社,2005.

共引文献5

同被引文献17

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部