摘要
以某大型主题乐园明日世界TL311项目工程为背景,针对弧形膜结构体系、墙体功能构造复杂、施工作业环境狭小、总体工期紧张的难题,以模块化建造为核心,以信息化和一体化的建造技术为手段,研发应用了预制复合墙体模块化建造技术、基于RFID的单元部品模块化建造技术和弧形曲面膜结构模块化建造技术等,确保了工程高质量地顺利完工。
Based on one large theme park(Epcot Center) Tomorrowland TL311 project as the background, aiming at the problems of the curved membrane structure system, the complex structure of the walls, the narrow construction environment and the tight overall construction period, taking the modular construction as the core and using the informationalized and integrated construction technology as the means, the modular construction technology of prefabricated composite walls, the modular construction technology of RFID-based unit components and the modular construction technology of curved membrane structures, etc. were researched, developed and applied to ensure the smooth completion of the project with high quality.
作者
田哲
潘峰
徐大为
TIAN Zhe;PAN Feng;XU Dawei(Shanghai Construction No.5 (Group) Co., Ltd., Shanghai 200063, China)
出处
《建筑施工》
2019年第6期1139-1141,共3页
Building Construction
关键词
主题乐园
模块化建造
复合墙体
膜结构
施工信息化
theme park
modular construction
composite wall
membrane structure
construction informatization