设计企业EPC工程总承包项目推行项目经理负责制的研究与探析 被引量:2

Research and Discussion on Implementation of Project Manager Responsibility System in EPC Mode General Contract Project of Design Enterprises
下载PDF
导出
摘要 在分析设计企业EPC(设计-采购-施工)工程总承包项目管理现状的基础上,探讨了如何建立适合设计企业的项目经理负责制,以完善项目经理的责任、权限和利益的制度建设,建立科学合理的激励机制和约束机制,使项目经理能够充分发挥其主观能动性,并通过建立的公司级和项目级的授权分级制度,规避不必要的风险,对实施项目过程中所必须面临的风险做到可控制、可管理。 Based on the analysis of the current situation of EPC (Engineering?Procurement-Construction) mode general contract project management of design enterprise, this paper discussed how to establish a project manager responsibility system suitable for design enterprises to improve the system construction of the project manager's responsibility, authority and interests, how to establish a scie ntific and reas on able in centive mecha nism and constraint mechanism to enable project managers to give full play to their subjective initiative, and through establishing a company? level and project-level authorization grading system, unnecessary risks are avoided and the risks that must be faced in the process of project impleme ntatio n could be controlled and man aged.
作者 周晓兵 ZHOU Xiaobing(Shanghai Xiandai Architecture Engineering & Consulting Co., Ltd., Shanghai 200041, China)
出处 《建筑施工》 2019年第6期1182-1184,共3页 Building Construction
关键词 设计企业 工程总承包项目 项目经理负责制 风险控制 design enterprise EPC model general contract project project manager responsibility system risk control
  • 相关文献

同被引文献7

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部