摘要
本文通过调研相关设计、施工以及设备制造企业,从风资源评估以及风电机组选型与布置、地质勘测、风机基础选型与设计以及施工组织设计等各个专业层面,梳理了目前国内海上风电项目在勘测设计阶段存在的部分问题,并针对问题提出了优化思路。
In this paper,through the investigation of related design,construction and equipment manufacturing enterprises,from the wind resources evaluation,wind turbine selection and layout,geological survey,fan foundation selection and design,construction organization design and other professional levels,This paper combs some problems existing in the survey and design stage of domestic offshore wind power projects,and puts forward some optimization ideas for the problems.
作者
冯宇
FENG Yu(Three Gorges Group Shanghai Survey and Design Research Institute Co.,Ltd.,Shanghai 200434,China)
出处
《科技视界》
2019年第16期28-29,40,共3页
Science & Technology Vision
关键词
海上风电
优化设计
风资源评估
地质勘测
Offshore wind power
Optimization design
Wind resource assessment
Geological survey