期刊文献+

深井高应力回采巷道底鼓协同控制技术研究及应用 被引量:4

Research and Application of Floor Heave Collaborative Control Technology in Deep Mine High Stress Coal-winning Roadway
下载PDF
导出
摘要 随着煤矿深部开采的不断加深,巷道围岩所处的应力环境更加复杂,由此导致的巷道围岩变形破坏问题越来越严重,尤其是深井高应力回采巷道的底鼓问题已成为制约深部矿井安全生产的重要因素。针对某深埋煤层回采巷道底鼓问题,在分析该深埋煤层回采巷道底鼓成因和治理底鼓主要方法的基础上,提出了围岩加固和卸压槽卸压结合的协同控制技术。 With the increasing depth of coal mining, the stress environment of roadway surrounding rock is more complex, resulting in more and more serious deformation and destruction of roadway surrounding rock, especially the floor heave problem of deep high stress coal-winning roadway has become an important factor restricting the safe production of deep mine. Aiming at the problem of floor heave in a deep seam coal-winning roadway, based on the analysis of the causes of floor heave in the deep seam coal-winning roadway and the main methods of controlling floor heave, a collaborative control technology combining surrounding rock reinforcement and pressure relief trough is proposed.
作者 张挺哲 ZHANG Ting-zhe(Changping Company,Jincheng Coal Industry Group,Jincheng,Shanxi,048000)
出处 《煤炭科技》 2019年第3期54-57,共4页 Coal Science & Technology Magazine
关键词 深部开采 高应力巷道 巷道底鼓 协同控制技术 支护参数优化 deep mining high stress roadway floor heave of roadway collaborative control technology supportingparameter optimization
  • 相关文献

参考文献7

二级参考文献42

共引文献272

同被引文献44

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部