期刊文献+

珠海横琴新区横琴天沐琴台基坑设计

Foundation Pit Design of Hengqin Tianmu Qintai in Zhuhai Hengqin New Area
下载PDF
导出
摘要 横琴天沐琴台项目位于珠海横琴新区横琴岛大小横琴山之间的天沐河东段中心人工岛,项目包括地下两层、地上最高十六层的全现浇钢筋混凝土结构酒店和配套的游艇码头工程,本文详细介绍了该酒店施工相关基坑开挖工程,并提出了该工程施工时需注意的要点。 Hengqin Tianmu Qintai project is located in the artificial island in the east section of Tianmu River between Hengqin Island and Hengqin Mountain in Hengqin New Area in Zhuhai.The project includes two underground storeys,the highest 16-storey fully cast-in-situ reinforced concrete structure hotel on the ground and the supporting yacht wharf project.This paper mainly introduces the foundation pit excavation works related to the construction of the hotel.
作者 全旭 李晓敏 Quan Xu;Li Xiaomin(Southwest Municipal Engineering Design & Research Institute of China in Chengdu, Sichuan, Chengdu Sichuan 610081, China)
出处 《城市建筑》 2019年第8期86-87,共2页 Urbanism and Architecture
关键词 水泥搅拌桩 钢板桩 灌注桩支护 土钉墙支护 基坑监测 cement mixing pile steel sheet pile cast-in-place pile support soil nailing foundation pit monitoring
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部