期刊文献+

院基寺水库新设取水口工程运行对溢洪道影响研究

Research on the Influence of New Water Intake Project on the Spillway of Yuanjisi Reservoir
下载PDF
导出
摘要 武汉市北部黄陂区前川城区因城市发展需要,拟在院基寺水库增设取水口。由于工程选址在水库溢洪道附近,为分析取水口建成运行对溢洪道的影响,分别从工程建设前后溢洪道泄流能力变化和工程运行时溢洪道边坡渗流稳定两个方面进行研究,采用Flow3D软件对工程建设前后不同泄流工况的流场进行建模并对比分析,应用Geostudio软件选取2处不利断面进行了边坡渗流稳定分析,结果表明工程建设前后溢洪道泄流流量变化小于1%且工程对泄流流场影响可忽略不计;若发生管道渗漏,溢洪道边坡最大水力坡降在规范允许范围内,且工程建设对溢洪道边坡渗流稳定影响较小,研究成果可供类似工程应用参考。 Due to the need of economic development, Qianchuan of Huangpi District, north of Wuhan City, a new water intake at Yuanjisi Reservoir is proposed because the site selection of the project is near the spillway of the built reservoir.In order to analyze the influence of water intake construction and operation on spillway, this paper discusses the change of spillway discharge capacity before and after construction and slope seepage stability respectively.Flow 3D software for modeling and comparative analysis of the flow field of different discharge conditions is used before and after engineering construction, and Geo studio software is used to select 2 adverse sections for modeling and seepage analysis.And the results show that the change of spillway discharge rate before and after construction is less than 1% and the influence of flow field can be ignored.Besides, if pipe leakage happened, the largest hydraulic slope of the spillway slope was within the allowable range of the code and construction has little influence on the stability of the spillway seepage.This paper can be used as a reference for similar engineering applications.
作者 曲晓阳 肖宜 王均星 张勇超 郭星锐 QU Xiao-yang;XIAO Yi;WANG Jun-xing;ZHANG Yong-chao;GUO Xing-rui(State Key Laboratory of Water Resources and Hydropower Engineering science Wuhan University, Wuhan 430072,China;Hubei Provincial Water Security Collaborative Innovation Center, Wuhan 430072,China)
出处 《中国农村水利水电》 北大核心 2019年第7期134-139,147,共7页 China Rural Water and Hydropower
关键词 院基寺水库 取水口工程 溢洪道 工程安全论证 流场 渗流分析 Yuanjisi Reservoir water intake project spillway engineering safety demonstration flow field seepage analysis
  • 相关文献

参考文献5

二级参考文献19

  • 1Hirt C W,Nichols B D.Volume of fluid(VOF) method for the dynamics of free boundaries[J].J.Comput.Phys.,1981,(39):201~225.
  • 2Mashaye K F,Ashgriz N.Advection of axisymmetric interfaces by the volume-of-fluid method[ J ].Int.J.Numer.Methods Fluids,1995,(20):1337~1361.
  • 3中国水利水电科学研究院.大渡河瀑布沟水电站岸边溢洪道水工模型试验研究报告.2004
  • 4Mashayek F,Ashgriz N.A Hybrid finite-element-volume-of-fluid method for simulating free surface flows and interfaces[J].International Journal of Numerical Method in Fluids,1995,(20):1363~1380.
  • 5Chern I L,Glimm J,McBryan O.Front tracking for gas dynamics[J].J.Comput.Phys.,1986,(62):83~110.
  • 6Harlow F H,Welch J F.Numerical calculation of time-dependent viscous incompressible flow of fluid with free surface[J].Phys.Fluids,1965,(8):2182~2190.
  • 7Miyata H,Nishimura S.Finite-difference simulation of nonlinear ship waves[J].J.Fluid Mech.,1985,(157):327~332.
  • 8Miyata H.Finite-difference simulation of breaking waves[J].J.Comput.Phys.,1986,(65):179~187.
  • 9《堤防工程设计规范》(GB50286-1998)[S].
  • 10《城市热力网设计规范》(CJJ34-2002)[S].

共引文献84

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部