期刊文献+

景洪水力式升船机大小门充间隙水运行流程设计 被引量:1

Jinghong Hydraulic Ship Lift Size Door Filling Gap Water Running Process Design
下载PDF
导出
摘要 景洪水电站使用中国原创并具有完全自主知识产权的世界首台水力式升船机,其电气控制是系统关键所在。以景洪水力式升船机的上闸首和承船厢系统为例,提出采用工作大门下落至挡水位、内套工作小门下落水流过顶充间隙水及密封框排水阀泄间隙水的自动化控制流程,实现承船厢上游对接过程中的快速自动充泄间隙水,已在景洪升船机中得到成功应用。 Jinghong Hydropower Station uses the world's first hydraulic lift ship with original Chinese intellectual property rights. Its electrical control is the key to the system. Taking the upper gate and the ship-carrying system of the Jinghong force ship lift as an example, it is proposed to use the working gate to fall to the water level, the inner working door to drop the water flowing through the top filling gap water and the sealing frame drain valve to drain the gap water. The automatic control process realizes the rapid automatic filling and draining water in the upstream docking process of the ship, which has been successfully applied in the Jinghong shiplift.
作者 王虎军 刘锦 王洋 何庆周 Wang Hujun;Liu Jin;Wang Yang;He Qingzhou(Xi'an Aerospace Automation Co., Ltd, Xi’an 710065, Shaanxi)
出处 《陕西水利》 2019年第6期135-137,共3页 Shaanxi Water Resources
关键词 水力式升船机 工作大门 工作小门 充泄间隙水 Hydraulic ship lift the working gate the working small gate and water leakage
  • 相关文献

参考文献5

二级参考文献13

  • 1雷念芳.垂直升船机运行流程设计与实现[J].计算机与数字工程,2005,33(7):121-124. 被引量:4
  • 2张树君.水口升船机主提升拖动系统直流调速控制技术浅析[A].中国科协2005年学术年会11分会场暨中国电机工程学会2005年学术年会论文集[C],2005.
  • 3汪云祥,扈晓雯.水口水电站2×500 t级垂直升船机[A].第一届水力发电技术国际会议,2006.48-55.
  • 4扈晓雯.水电站通航技术发展[A].国际航运协会2008年会暨国际航运技术研讨会,2008.
  • 5阳宪惠 徐用懋 魏庆福.现场总线技术及其应用[M].北京:清华大学出版社,2002.309-346.
  • 6长江水利委员会.《清江隔河岩第二级升船机总体技术要求》[Z].,..
  • 7钱志斌.水口升船机计算机监控系统设计[J].华东水电技术,2004,(1).
  • 8孙明刚,刘枫,张强.S型双环冗余工业控制以太网[J].西南大学学报(自然科学版),2008,30(3):127-130. 被引量:7
  • 9刘金堂,曹以南,凌云,马仁超,朱国金.景洪水力式升船机设计研究[J].水力发电,2008,34(4):43-45. 被引量:22
  • 10熊志华.水口升船机电气控制系统改造研究[J].舰船科学技术,2010,32(7):54-59. 被引量:6