摘要
以港珠澳大桥CB04合同段工程为例,对整体式模板设计进行了详细的研究,其中涉及到承台底模和外模设计、整体式墩身外模设计等内容,最终达到了预制构件的施工要求,从而确保了大型预制构件的施工质量。
Taking the CB04 Contract Section Project of Hong Kong - Zhuhai - Macao Bridge as an example, this paper studies the design of integral-type formwork in detail, which involves the design of bed molding and outer molding of base slab, and the design of the outer molding of integral-type pier body finally to meet the construction requirements of the precast components so as to ensure the construction quality of large-sized precast component.
出处
《城市道桥与防洪》
2019年第7期222-224,234,M0025,共5页
Urban Roads Bridges & Flood Control
关键词
整体式模板
预制构件
港珠澳大桥工程
integral-type formwork
precast component
Hong Kong - Zhuhai - Macao Bridge Project