期刊文献+

缩短冷轧产品生产周期的思考及实践

THINKING AND PRACTICE ON SHORTENING PRODUCTION CYCLE OF COLD ROLLED PRODUCTS
下载PDF
导出
摘要 钢铁市场竞争日益激烈,为最大限度地满足客户需求及市场需求,严格按照订单生产并准确及时交货,是必须要解决的关键问题。结合某钢铁企业的实际情况,提出了缩短产品生产周期的有效措施,确保了产品的按期交货。 The competition of steel market is becoming increasingly fierce. In order to satisfy the customer requirements and market demand to the maximum extent, production in strict accordance with the order and accurate and timely delivery is the key problem that must be solved. Based on the actual situation of a steel enterprise, this paper puts forward to some effective measures to shorten the production cycle of the products, which ensure the timely delivery of the products.
作者 高华 王少宁 李兆宇 Gao Hua;Wang Shaoning;Li Zhaoyu(Manufacturing Department, Tangshan Iron and Steel Company of HBIS Group, Tangshan 063016, China)
出处 《冶金信息导刊》 2019年第3期12-14,共3页 Metallurgical Information Review
关键词 冷轧 生产周期 交货期 cold rolling production cycle delivery date
  • 相关文献

参考文献1

二级参考文献10

  • 1Portmann M C, Rohr D. Hierarchical production management applied to an iron and steel industry [ J ].Journal of Intelligent ManuJhcturing, 1995,6 (2) : 79 - 85.
  • 2Tang L X,Liu J Y,Rong A, et al. A review of planning and scheduling system and methods for integrated steel production [J ]. European Journal of Operational Research, 2001,133 (1):1-20.
  • 3Tang L X, Liu G L. A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan iron and steel complex[J]. European Journal of Operational Research, 2007,182(3) : 1453 - 1468.
  • 4Goutarn D, Robert F. A survey of mathematical programming applications in integrated steel plants [ J]. Manufacturing and Service Operations Management, 2001,3(4):387 400.
  • 5Cowling P, Reziq W. Integration of continuous caster and hot strip mill planning for steel production [ J ]. Journal of Scheduling, 2003,3(4) : 185 - 208.
  • 6Ning S S, Wang W. Multi-objective optimization model and algorithm for hot rolling lot planning [C]//Sixth World Congress on. Intelligent Control and Automation, Piscataway: IEEE Press, 2006 : 7390 - 7394.
  • 7Cowling P, Quelhad D, Petrovie S. Dynamic scheduling of steel casting and milling using multi-agents [J]. Production PlanningandControl, 2003,15(2).'178 188.
  • 8Zhu B L, Yu H B, Huang X Y. Research approaches on integrated planning for iron and steel enterprises[ C]//IEEE International Conference on Systems, Man and Cybernetics. Taipei: IEEE Press, 2006:5024 - 5029.
  • 9徐心和,陈雄,郭令忠,谈金东.炼钢-连铸-热轧一体化管理[J].冶金自动化,1997,21(3):1-4. 被引量:14
  • 10张涛,王梦光,唐立新,宋健海,杨建夏.钢厂合同计划的模型与算法[J].控制理论与应用,2000,17(5):711-715. 被引量:17

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部