4A. P. Sage, 1992, Systems Engineering. N.Y. : John Wiley & Sons Inc.
5Grieco A, Semeraro Q , Tolio T, 2001, A Review of Different Approaches to the FMS Loading Problem,International Journal of Flexible Manufacturing SYSTEMS 13 (4): 361-384.
6Pandza K, Polajnar A, Buchmeister B, 2003, Strategic Process of Capability Accumulation: A Case-study in Manufacturing organization, Strojarstvo 45 (1-3):35-45 JAN-JUN.
7Wiendahl HP, Harms T, 2004, Self-organized Production Based on Agent Theory, Production Planning &Control 15 (2): 213-224.