摘要
某公路工程技术难度大,工况复杂,在准备、设计、施工和竣工交付等阶段应用BIM技术加强管理,保证各项目标实现。在总结经验教训的基础上提出应构建以业主为核心的BIM实施协同工作体系等观点。
A highway project faced big technical difficulty and complex construction conditions. BIM technique was used in the stages of preparation, design, construction, completion and delivery, to strengthen the management and to guaranteed the realization of each project objectives. Based on summarization of relevant experiences, this paper proposed that BIM implementation collaboration system focused on owners shall be created.
作者
洪少枝
何秋恩
黄剑春
吴露方
HONG Shao-zhi;HE Qiu-en;HUANG Jian-chun;WU Lu-fang(Tongji University, 201204, Shanghai, China;China Railway Bridge Engineering Group Co., Ltd., 430050, Wuhan, China;Jinzheng Technology (Shanghai) Co., Ltd., 200120, Shanghai, China;Shanghai Construction Group, 200080, Shanghai, China)
出处
《建筑技术》
2019年第7期785-788,共4页
Architecture Technology
基金
国家重点研发计划项目(2016YFB1200602-02)
上海市科技发展基金项目(13231200702)
关键词
建筑信息模型
项目管理
BIM协同工作体系
building information model
project management
BIM collaboration system