期刊文献+

某净水厂取水口迁建方案的选择和比较 被引量:2

Selection and Comparison of Relocation Plans for Drinking Water Plant Intake
下载PDF
导出
摘要 安徽某市新建石化危化品码头选址位于现状第二、三水厂取水口上游3.7km处,由于该处为现状取水口的二级保护区边缘,码头的建设对现状水厂取水水质存在安全风险,故需对原水厂取水口进行迁建。文中结合城市总体规划及水功能区划的要求,提出取水口的两种迁建方案,并对方案进行了技术和经济比较。 A new hazardous petrochemical terminal will be built in a city of Anhui Province.It is located 3.7 km at the upstream of the water intake of the second and third water plants,on the edge of secondary protection zone for water intake,which poses a safety risk to the intaking water quality of the water plants,so it is necessary to relocate the original water intake.Based on the requirements of general urban planning and water function zoning,two relocation proposals are made and compared in both technical and economic aspects in this paper.
作者 王红禹 WANG Hongyu(SGIDI Engineering Consulting (Group) Co.,Ltd.,Shanghai 200093,China)
出处 《净水技术》 CAS 2019年第A01期57-60,共4页 Water Purification Technology
关键词 净水厂 取水口 迁建 城市总体规划 水功能区划 drinking water plant water intake relocation general urban planning water function zoning
  • 相关文献

同被引文献4

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部