从三方面对内压外拉预应力杆的受压弹性承载力进行了分析:一是纯理论分析,包括静力法和能量法的求解;二是非线性弹性有限元分析,采用ANSYS和ABAQUS两种软件;三是试验研究。三个方面的研究结果均表明:施加预拉力不能提高弹性临界荷载。欧本试验和非线性有限元分析的结果还表明:芯棒施加预压力降低了压杆的整体临界荷载。
The paper studied the buckling of pre-stressed columns where the exterior tube is pre-tensioned by a pre-compressed core bar.Analysis is carried out in three ways.One is the theoretical analysis where the static approach and the energy method judging the stability of a structural system are used separately;the second method is the FE analysis using ANSYS and ABAQUS;the third is the test verification.The results of these three different studies show that the prestress in the column can not increase the buckling load,but reduce it slightly.
作者
童根树
陈明
张磊
程鹏
TONG Genshu;CHEN Ming;ZHANG Lei;CHENG Peng(Institute of High-Performance Structures and Materials,Zhejiang University,Hangzhou 310058,China;Shanghai Open Steel Structure Co.,Ltd.,Shanghai 201500,China)
出处
《钢结构》
2019年第6期1-7,43,共8页
Steel Construction
关键词
压杆
预应力
临界荷载
compressed member
prestress