摘要
桥梁支座由于自身缺陷,以及设计、施工、使用过程中的不利影响出现病害,影响了桥梁的正常使用。针对某城际铁路连续梁桥主墩支座更换工程实例,对超大吨位支座更换施工技术进行总结,通过同步顶升设备及倒序施工方法,成功实现了超大吨位支座的安全、快速更换。
Bridge supports are damaged due to their own defects and adverse effects during design,construction and operation,which affect the normal use of bridges.Aiming at the replacement project of the main pier support of a continuous intercity railway continuous beam bridge,the replacement construction techniques of the super-large tonnage support were summarized.Through the synchronous lifting equipment and the method of construction in reverse order,the safe and rapid replacement of the super-large tonnage support were successfully realized.
作者
彭永胜
王佳贵
贲立刚
康雪成
PENG Yongsheng;WANG Jiagui;YAN Ligang;KANG Xuecheng(China Communications Road Construction Co.,Ltd.,Beijing 100027,China;Beijing Tehida Engineering TechnologyCo.,Ltd.,Beijing 100011,China)
出处
《钢结构》
2019年第6期103-106,共4页
Steel Construction
关键词
超大吨位
连续梁桥
支座更换
同步顶升
倒序
super-large tonnage
continuous beam bridge
support replacement
synchronous lifting
reverse order