超大吨位连续梁桥支座更换施工技术研究 被引量:2

RESEARCH ON REPLACEMENT CONSTRUCTION TECHNIQUE OF SUPER-LARGE TONNAGE CONTINUOUS BEAM BRIDGE SUPPORT
下载PDF
导出
摘要 桥梁支座由于自身缺陷,以及设计、施工、使用过程中的不利影响出现病害,影响了桥梁的正常使用。针对某城际铁路连续梁桥主墩支座更换工程实例,对超大吨位支座更换施工技术进行总结,通过同步顶升设备及倒序施工方法,成功实现了超大吨位支座的安全、快速更换。 Bridge supports are damaged due to their own defects and adverse effects during design,construction and operation,which affect the normal use of bridges.Aiming at the replacement project of the main pier support of a continuous intercity railway continuous beam bridge,the replacement construction techniques of the super-large tonnage support were summarized.Through the synchronous lifting equipment and the method of construction in reverse order,the safe and rapid replacement of the super-large tonnage support were successfully realized.
作者 彭永胜 王佳贵 贲立刚 康雪成 PENG Yongsheng;WANG Jiagui;YAN Ligang;KANG Xuecheng(China Communications Road Construction Co.,Ltd.,Beijing 100027,China;Beijing Tehida Engineering TechnologyCo.,Ltd.,Beijing 100011,China)
出处 《钢结构》 2019年第6期103-106,共4页 Steel Construction
关键词 超大吨位 连续梁桥 支座更换 同步顶升 倒序 super-large tonnage continuous beam bridge support replacement synchronous lifting reverse order
  • 相关文献

参考文献6

二级参考文献19

共引文献35

同被引文献12

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部