期刊文献+

带压开采掘进巷道隐伏陷落柱探查与治理 被引量:1

Exploration and Treatment of Concealed Collapse Column in Roadway with Pressure Mining
下载PDF
导出
摘要 为了查明不连沟煤矿F6207工作面运输巷掘进工作面前方构造的类型、富水性和范围,采用音频电透、瞬变电磁、直流电法等物探方法和井下钻探,对巷道隐伏构造进行探查。物探结果表明:在19号硐室前方180m附近,存在物探异常区,且具有导水性。结合井下钻探,确定该构造异常区为导水陷落柱,位于巷道掘进工作面正前方37.63m处,其长轴约66m,短轴约42m。提出了"两轮注浆+堵水效果检测"的防治措施,设计了治理方案和钻孔参数;并根据治理方案,采用静压分段下行式循环充填注浆、静压分段下行式循环裂隙注浆2种注浆工艺,成功治理了富水陷落柱,实现了安全掘进。 In order to determine the type,water-rich and scope of the geological structure in front of the driving face of the transportation roadway in F6207 working face of Buliangou Coal Mine,the audio frequency,transient electromagnetic,direct current geophysical prospecting and underground drilling were used to explore the buried geological structure of the roadway.The results showed that there was a geophysical anomaly area with water conductivity near 180 m in front of the 19 th chamber.Combined with downhole drilling,the structure anomaly area was determined as a water guiding collapse column,and it was located at 37.63 mstraight ahead of the heading end of the roadway,its long axis was about 66 m,the short axis was about 42 m.The prevention and control measures of"three-round grouting mode+water plugging effect detection"were put forward,and the static grouting process was carried out by static pressure sectioned down-flow circulating filling grouting and static pressure sub-staged cyclic cracking.The water-rich collapse column was successfully controlled and safe excavation was realized.
作者 周鹏 郭瑞 兰天龙 ZHOU Peng;GUO Rui;LAN Tianlong(Inner Mongolia Mengtai Buliangou Coal Industry Co.,Ltd.,Jungar Banner 017100,China)
出处 《建井技术》 2019年第1期14-18,26,共6页 Mine Construction Technology
关键词 带压开采 掘进工作面 隐伏陷落柱 探查 治理 mining under safe waterpressure of aquifer driving face buried collapse column exploration treatment
  • 相关文献

参考文献10

二级参考文献94

共引文献222

同被引文献13

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部