期刊文献+

商品混凝土智能化运输调度监控管理系统研究 被引量:1

Research on monitoring and management system of commercial concrete intelligent transportation dispatching
下载PDF
导出
摘要 目前混凝土在厂房进行配制,将混凝土装入混凝土搅拌运输车内运往施工现场,随后混凝土通过泵送机泵送到高层建筑的浇筑区。在这个过程中存在些许不足,首先无法得知混凝土搅拌运输车的动态休息,其次目前的混凝土搅拌效率较低,无法准确得知泵车的泵送数据无法根据现况的具体情况做出及时的调整。针对以上问题,有必要对其进行改进。本文就商品混凝土智能化运输调度监控管理系统进行介绍,介绍一种可以提高搅拌效率、获取搅拌运输车动态信息、泵送信息和交流便捷的商品混凝土智能化运输调度监控管理系统。 At present,the concrete is prepared in the factory,and the concrete is loaded into the concrete mixer truck and transported to the construction site.Then the concrete is pumped to the pouring area of the high-rise building by the pumping machine.There are some shortcomings in this process.Firstly,the dynamic rest of the concrete mixer truck cannot be known.Secondly,the current concrete mixing efficiency is low.It is impossible to know accurately that the pumping data of the pump truck cannot be timely according to the specific conditions of the current situation.Adjustment.In response to the above problems,it is necessary to improve them.This paper introduces the monitoring and management system of co mmercial concrete intelligent transportation dispatching,and introduces a monitoring and management system for co mmercial concrete intelligent transportation dispatching that can improve the mixing efficiency,obtain the dynamic information of the mixing truck,pumping information and communication.
作者 何莺 HE Ying(Sichuan Xingcheng Gangrui Building Material Co.,LTD, Chengdu 610213,China)
出处 《四川建材》 2019年第7期12-13,共2页 Sichuan Building Materials
关键词 混凝土 智能化 运输调度 管理系统 concrete intelligent transportation scheduling management system
  • 相关文献

参考文献5

二级参考文献12

  • 1宋益旭.商品混凝土的优越性[J].油气田地面工程,2005,24(12):44-44. 被引量:1
  • 2肖军.混凝土拌和楼车辆识别调度技术[J].人民长江,2007,38(3):67-67. 被引量:2
  • 3Lu,Ming and Lam,H.C.Optimized Concrete Delivery Scheduling Using Combined Simulation and Genetic Algorithms.Proceedings of the 2005 Winter Simulation Conference,2005 : 2572-2580.
  • 4Yan S Y,Lal W S.An optimal scheduling model for ready mixedconcrete supply with overtime considerations. Automation inConstruction . 2007
  • 5Sirisuwan A,Tanwanichkul L.Optimizing of scheduling and dis-patching RMC trucks using genetic algorithms for one plant-multisites. The 6th Regional Symposium on In-frastructure Development . 2008
  • 6Feng C W,Wu H T.Using genetic algorithms to optimize the dis-patching schedule of RMC cars. Proceedings ofthe 17th International Symposium on Automation and Robotics inConstruction . 2000
  • 7Feng Chung-Wei,Cheng Tao-Ming,Wu Hsien-Tang.Optimizing the schedule of dispatching RMCtrucks through genetic algorithms. Automation inConstruction . 2004
  • 8N.F. Matsatsinis.Towards a Decision Support System for the Ready Concrete Distribution System: A Case of a Greek Company. European Journal of Operational Research . 2004
  • 9徐万平,徐虹,吴燕明,刘友元.三峡工程98.7砼拌和楼车辆调度识别系统的开发与应用[J].制造业自动化,2001,23(2):50-51. 被引量:1
  • 10张明轩.商品混凝土的应用技术[J].山西建筑,2002,28(4):80-81. 被引量:9

共引文献9

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部