某选矿厂处理矿石为蚀变岩型低硫化物含金矿石,其原生矿泥占比高达15%,导致生产流程运行不畅,选别困难。经过2次技术改造,采用粗碎+半自磨+球磨的碎磨流程及浮选柱优先浮选+浮选机粗、精、扫选的柱-机联合浮选流程,取得了良好的效果,生产规模由600t/d提高至1500t/d,金回收率提高1.48百分点,年创造效益1489.6万元,经济效益和社会效益显著。
An altered rock type low-sulfide gold-bearing ore with a primary slime content of up to 15 % is processed in a flotation plant,which is not a smooth production flowsheet and ineffective.Through 2 technical renovation,the coarse crushing+semi-auto grinding+ball mill grinding process and the preferential flotation with flotation column+roughing, cleaning and scavenging with column-cell joint flotation process are decided and have achieved good results:the production scale has increased from 600 t/d to 1 500 t/d,the gold recovery rate has increased by 1.48 percentage points,the annual profits created can be 14.896 million yuan.The process can generate great economic and social benefits.
作者
白俊智
Bai Junzhi(Zijin Mining Group Co. ,Ltd.)
出处
《黄金》
CAS
2019年第7期54-58,共5页
Gold
关键词
高含泥金矿石
柱-机联合
浮选
碎磨
技术改造
highly argillaceous gold ores
column-cell combination
flotation
crushing and grinding
technical renovation