摘要
针对沿空留巷高水材料充填体特性与力学作用机理不够完善等问题,根据凌志达煤矿15210工作面具体地质条件,采用理论分析、力学计算结合现场实测等手段,建立了高水材料充填体切顶力学模型,分析了其控制巷道稳定的力学机理,计算得到了沿空留巷充填体切顶阻力为2265kN/m,确定了充填体具体参数。
In this paper,the problems of imperfect filling characteristics and mechanical mechanism of high-water material in gob-side retaining roadway are discussed.According to the geological conditions of the15210 working face in Lingzhida Coal Mine,the mechanical model of cutting roof of filling body with high-water material is established by means of theoretical analysis,mechanical calculation and field measurement,and the mechanical mechanism of controlling roadway stability is analyzed.The filling body cutting along gob-side retaining roadway was calculated and obtained.The top resistance is 2265kN/m,and the specific parameters of filling body are determined.
作者
姚健
Yao Jian(Institute of Science and Technology,Shanxi Coal IMP.& EXP.Group Co.,Ltd.,Shanxi Taiyuan 030006)
出处
《山东煤炭科技》
2019年第7期14-16,19,共4页
Shandong Coal Science and Technology
关键词
充填体
沿空留巷
支护
filling body
gob-side entry retaining
support