摘要 5202巷过断层前,进行了断层对巷道掘进影响机理分析,采用深孔爆破+综掘机掘进相结合的后退挑顶过正断层的方案,利用锚网索、注浆加固、架钢棚的加强支护方式维护巷道。顶板离层监测结果表明,支护能有效地减少断层区域顶板破坏。 Before the 5202 roadway crosses the fault,the mechanism of the influence of the fault on the roadway excavation is analyzed.The scheme of retreating and overhanging the normal fault is adopted,which combines deephole blasting with fully mechanized excavator excavation.The roadway is maintained by bolt-mesh cable,grouting reinforcement and steel shed reinforcement.Monitoring results of roof separation show that support can effectively reduce roof failure in fault area.
作者 韩伟 Han Wei(Tongsheng Shuerli Coal Industry Co.,Ltd.,Datong Coal Mine Group,Shanxi Datong 037000)
出处 《山东煤炭科技》 2019年第7期40-42,共3页 Shandong Coal Science and Technology
关键词 煤巷 断层 支护 coal roadway fault support
  • 相关文献

参考文献6

二级参考文献46

共引文献53

同被引文献10

引证文献3

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部