跨径式龙门吊轨道基础设计与施工 被引量:7

Design and Construction of Span Track Foundation for Gantry Crane Located
下载PDF
导出
摘要 文章结合长沙市万家丽220kV电力隧道项目龙门吊轨道基础设计与施工,简单介绍了跨径式龙门吊轨道基础设计与施工。通过工程实践表明,龙门吊轨道基础采用该设计方法,结构合理、施工安全,具有一定的借鉴性。 Combined with the design and construction of track foundation for gantry crane located of the Changsha Wanjiali 220kV electric power tunnel engineering, introduces the design and construction of span track foundation for gantry crane located. The project practice showed that track foundation for gantry crane located have many superiorities such as reasonable structure, safe and efficient construction with this design method, It has some referential meaning to construction of gantry c rane.
作者 吕涛 龙彪 王文 陈亚军 孙淼 Lv Tao;Long Biao;Wang Wen;Chen Yajun;Sun Miao(CCFEB Civil Engineering Co.Ltd,Changsha, Hunan 410004)
出处 《工程技术研究》 2019年第11期152-154,共3页 Engineering and Technological Research
基金 湖南省工程建设新技术研发及软科学研究计划项目(2018年第四批No.9) 湖南省建筑业新技术应用示范工程创建计划项目(2018年第四批No.43)
关键词 跨径式 龙门吊 轨道基础 设计与施工 span gantry crane track foundation design and construction
  • 相关文献

参考文献4

二级参考文献14

  • 1韩晓龙.集装箱港口龙门吊的最优路径问题[J].上海海事大学学报,2005,26(2):39-41. 被引量:24
  • 2KIM Ki Young, KIM Kap Hwan. A routeing algorithm for a single transfer crane to load export containers onto a container ship[J]. Computers & Ind Eng, 1997, 33(3/4) : 673-676.
  • 3KIM Ki Young, KIM Kap Hwan. An optimal routeing algorithm for a transfer crane in port container terminals[J]. Transportation Sci, 1999, 33 (1) : 17-33.
  • 4NARASIMHAN A, PALEKAR U S. Analysis and algorithms for the transtainer routeing problem in container port operations [J]. Transportation Sci, 2002, 36(1): 63-78.
  • 5KIM Ki Young, KIM Kap Hwan. Heuristic algorithm for routeing yard-side equipment for minimizing loading times in container terminals[J]. Naval Res Logistics, 2003, (50) : 498-514.
  • 6LEE Der-Horng, CAO Zhi, MENG Qiang. Scheduling of two-transtainer systems for loading outbound containers in port container terminals with simulated annealing algorithm [ J ]. Sci Direct, Int J Production Econ, 2007, 107 ( 1 ) : 115-124.
  • 7CAO Zhi, LEE Der-Horng, MENG Qiang. Deployment strategies of double-rail-mounted gantry crane systems for loading outbound containers in container terminals[J]. Int J Production Econ, 2008, 115( 1 ) : 221-228.
  • 8NG W C. Crane scheduling in container yards with inter-crane interference[J]. Eur J Operational Res, 2005, 164: 64-78.
  • 9JAVANSHIR H, GANJI S R S. Yard crane scheduling in port container terminals using genetic algorithm[J]. J Ind Eng Int, 2010, 6 ( 11 ) : 39- 50.
  • 10MAK Kai Ling, SUN Di. A scheduling method for cranes in a container yard with inter-crane interference [ J ]. Electronic Eng & Computing Technol, 2010, 60: 715-725.

共引文献16

同被引文献37

引证文献7

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部