摘要
文章结合长沙市万家丽220kV电力隧道项目龙门吊轨道基础设计与施工,简单介绍了跨径式龙门吊轨道基础设计与施工。通过工程实践表明,龙门吊轨道基础采用该设计方法,结构合理、施工安全,具有一定的借鉴性。
Combined with the design and construction of track foundation for gantry crane located of the Changsha Wanjiali 220kV electric power tunnel engineering, introduces the design and construction of span track foundation for gantry crane located. The project practice showed that track foundation for gantry crane located have many superiorities such as reasonable structure, safe and efficient construction with this design method, It has some referential meaning to construction of gantry c rane.
作者
吕涛
龙彪
王文
陈亚军
孙淼
Lv Tao;Long Biao;Wang Wen;Chen Yajun;Sun Miao(CCFEB Civil Engineering Co.Ltd,Changsha, Hunan 410004)
出处
《工程技术研究》
2019年第11期152-154,共3页
Engineering and Technological Research
基金
湖南省工程建设新技术研发及软科学研究计划项目(2018年第四批No.9)
湖南省建筑业新技术应用示范工程创建计划项目(2018年第四批No.43)
关键词
跨径式
龙门吊
轨道基础
设计与施工
span
gantry crane
track foundation
design and construction