摘要
在核电领域,新设计堆型的仿真机承担了培训、验证等多重功能,尤其在首台机组的建设中发挥着巨大作用.三门核电站建设了世界上第一台AP1000机组,由于在建设过程中缺少相同堆型的运行核电站可供参考,工程建设中面临着实践经验不足的问题.在这一现状下,三门核电充分发挥模拟机的作用,在满足基础的操纵员培训的前提下,使用全范围模拟机执行即时培训、规程验证等工作,为首台机组顺利投产发挥了巨大作用.
In the field of nuclear power plant, the simulator of newly designed reactor, especially of the first constructed unit, undertakes multiple functions, such as training, verification and so on. Sanmen Nuclear Power Plant has built the first AP1000 unit in the world. Due to the lack of the same reactor type of nuclear power plant for reference in the construction process, the engineering construction is faced with the problem of lack of practical experience. In this situation, Sanmen nuclear power plant gives full play to the role of the simulator, and on the premise of satisfying the basic operator training, the full scope simulator is used to carry out just-in-time training, procedure verification and so on. It played a great role in the construction of the first unit.
作者
曲伟
Qu Wei(Sanmen Nuclear Power Company Ltd., Zhejiang, Sanmen, 317112, China)
出处
《仪器仪表用户》
2019年第9期64-66,共3页
Instrumentation