期刊文献+

曼点水库碾压混凝土大坝质量成果控制与分析 被引量:1

Quality Result Control and Analysis of RCC Dam in Mandian Reservoir
下载PDF
导出
摘要 曼点水库碾压混凝土大坝为云南省景洪市第一座碾压混凝土重力坝。文章对曼点水库大坝(渡汛高程1055.00m)碾压混凝土质量成果进行了统计分析,碾压混凝土机口取样、现场检测、取芯样等检测成果表明,混凝土各项性能指标均满足设计要求,为及时掌握工程质量动态和后续工程施工进行质量控制提供了指导,可为同类型坝施工质量控制提供借鉴和参考。 The RCC dam of Mandian Reservoir is the first RCC gravity dam in Jinghong, Yunnan Province. Mandian Reservoir Dam (flood elevation 1055.00m) RCC quality results are statistically analyzed in the paper. RCC outlet sampling, field test and core sampling test results show that the performance indicators of concrete meet the design requirement, thereby providing reference for timely mastering project quality dynamics and controlling the quality of subsequent project construction, and providing reference for construction quality control of similar dams.
作者 聂素娥 段昌元 和强 NIE Su ’e;DUAN Changyuan;HE Qiang(Xishuangbanna Water Conservancy and Hydropower Project Quality Supervision Station,Jinghong 666100,China;Xishuangbanna Water Conservancy and Hydropower Project Quality Testing Center,Jinghong 666100,China)
出处 《中国水能及电气化》 2019年第7期1-11,共11页 China Water Power & Electrification
关键词 碾压混凝土 质量 分析 roller compacted concrete quality analysis
  • 相关文献

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部