结合金义东市域轨道交通工程与国铁换乘车站的设计方案,通过论述不同建设时序、不同预留条件下换乘方案的比选及优化过程,总结得出换乘设计应结合工程实际合理布置站位,并通过切实可行的方法优化换乘节点及换乘流线、尽量缩短换乘距离并降低换乘高差。
According to the transfer design of Jinyidong urban transit railway and national railway,through discussing the comparison and optimization process of transfer schemes under different construction time sequence and different reservation conditions,it is concluded that the transfer design should reasonably arrange the station location in accordance with the actual project, and optimize the transfer nodes and transfer lines through practical methods, shorten the transfer distance as far as possible and reduce the transfer height difference.