期刊文献+

水电站电气二次设备安装过程控制研究

Study on installation process Control of Electric Secondary equipment in Hydropower Station
下载PDF
导出
摘要 随着国民生产的不断飞速发展,电力作为一种不可或缺资源日益紧张,水电站作为一种成熟的发电模式,在中国得到广泛的应用。在水电站修建过程中,电气设备的安装过程甚至可以说成是水电站的二次修建,因为之间关系到整个水电站的安全以及能都达到预期的输出功率,所以在施工过程中必须予以严格有效的控制。本文对设备安装过程提出加点建议,望对各位同仁有所借鉴。 with the rapid development of national production,electric power,as an indispensable resource,is increasingly scarce.As a mature power generation mode,hydropower station has been widely used in China.In the process of hydropower station construction,the installation process of electrical equipment can even be described as the secondary construction of hydropower station,because it is related to the safety of the whole hydropower station and the ability to achieve the expected output power.Therefore,in the construction process must be strict and effective control.This article to equipment installation process puts forward the addition suggestion,hoped to each colleague has the reference.
作者 詹伟 ZHAN Wei(Gezhouba Group Mechanical and Electrical Construction Co.,Ltd.,Yunnan Lincang,675811,China)
出处 《数码设计》 2018年第2期73-73,76,共2页 Peak Data Science
关键词 水电站 二次设备安装 控制 hydropower station secondary equipment installation control
  • 相关文献

参考文献4

二级参考文献6

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部