摘要
以琅岐沈海高速复线连接线道路现浇桥工程为例,从支架施工、模板施工、砼施工、预应力施工等方面进行了详细阐述,确保了工程方案的实用性和可行性。
Taking the cast-in-situ bridge project of langqi-shenyang-hai high-speed double-track connection road as an example,this paper elaborates in detail the aspects of support construction,formwork construction,concrete construction and pre-stressing construction,so as to ensure the practicability and feasibility of the project plan.
作者
张燊
Zhang Bian(Jingyi Construction Industry Group Co.,Ltd.,Fuzhou,Fujian 350000)
出处
《江西建材》
2019年第7期198-199,共2页
Jiangxi Building Materials
关键词
复线
现浇桥工程
施工措施
Double track
Cast-in-place bridge project
Construction measures