沈阳市长青桥钢箱梁落架顺序计算与优化

Calculation and optimization of removal sequence of steel box girder of Changqing Bridge in Shenyang
下载PDF
导出
摘要 长青桥新桥为大跨度连续钢箱梁结构,最大跨近150 m。钢结构架设方案为钢管组成的支架,支架间距12 m^15 m。由于钢箱梁是大跨度连续钢箱梁结构,拆除一组支架会对其他支架的反力有影响,支架的反力会随着落架过程变化。在设计支架的过程中,不仅要考虑架设钢梁的上部重量,还要考虑落架过程中的支架反力,以保证支架的受力合理,安全。 The new Changqing Bridge is a long-span continuous steel box girder structure with a maximum span of nearly 150 m. The erection scheme of steel structure is a steel pipe bracket with a spacing of 12 m to 15 m. Because the steel box girder is a long-span continuous steel box girder structure,the removal of a group of brackets will have an impact on the reaction of other brackets,and the reaction of brackets will change with the landing process. In the process of designing the support,not only the upper weight of erecting the steel beam,but also the support reaction in the process of landing should be considered to ensure the reasonable and safe force of the support.
作者 李博强 Li Boqiang(Design Institute of Civil Engineering&Architecture of Dalian University of Technology Co.,Ltd.,Dalian 116024,China)
出处 《山西建筑》 2019年第12期124-126,共3页 Shanxi Architecture
关键词 钢箱梁 施工方案优化 支架验算 steel box girder construction scheme optimization bracket checking computations
  • 相关文献

参考文献3

二级参考文献11

  • 1JTJ025-86.公路桥涵钢结构及木结构设计规范[S].[S].北京,1988..
  • 2小西一郎 宋慕兰等译.钢桥[M].北京:人民铁道出版社,1980..
  • 3吴冲.现代钢桥[M].北京:人民交通出版社,2006.
  • 4道路桥示方书·同解说[S].
  • 5TB 10002.2-2005,铁路钢桥设计规范[S].
  • 6中国铁道科学研究院.崇启大桥大跨度连续钢箱梁关键技术研究[M].2009.
  • 7中交公路规划设计院有限公司.崇明至启东长江公路大桥(江苏境)跨江大桥初步设计[M].2008.
  • 8许春荣,王志诚,朱斌,等.崇启大桥主桥上部结构设计[c]//2011年全国桥梁学术会议论文集.北京:人民交通出版社,2011.
  • 9西南交通大学风工程试验研究中心.崇启大桥主桥成桥状态涡激振动特性气弹模型试验研究[M].2010.
  • 10秦顺全.分阶段施工桥梁的无应力状态控制法[J].桥梁建设,2008,38(1):8-14. 被引量:115