2018版公路工程概预算编制办法解读 被引量:3

Interpretation of the 2018 Edition Highway Engineering Budget Estimates Compilation Method
下载PDF
导出
摘要 对2018年版《公路工程建设项目概算预算编制办法》与2007年版《公路工程基本建设项目概算预算编制办法》进行对比,从费用组成变化、计算程序和形式的变化、新增或变化较大的费用几方面分析2版编制办法的区别,可以看出,新版编制办法对设计和概预算编制提出了更高要求。 A conparison is made between the 2018 edition Highway Construction Projects Budget Estimates Compilation Method and the 2007 edition Highway Capital Construction Projects Budget Estimates Compilation Method. The differences between the two compilation methods are analyzed from the aspects of Cost composition change, calculation procedure and form change, Newly added or large changed expense items, etc. Through analysis, it can be seen that the new edition compilation method puts forward higher requirements for the design and budget estimation.
作者 丁加明 Ding jiaming
出处 《铁路工程技术与经济》 2019年第4期44-48,共5页 Railway Engineering Technology and Economy
关键词 公路工程 概算 预算 编制办法 Highway engineering Budget estimate Budget Compilation method
  • 相关文献

同被引文献18

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部