摘要 针对印尼一号双塔项目超大深基坑施工,通过土方快速开挖、出土口垂直驳运、地下型钢外包柱分段浇筑等关键技术创新及应用,有效保证逆作施工效率,控制逆作施工期间基坑变形。同时对地下连续墙变形数据进行分析,并结合分析结果,建议后期类似施工通过在坡道坡顶区域进行钢支撑加密处理,可有效减小坡道处基坑变形值。 Aiming at the super-large deep foundation excavation construction of Indonesia One twin towers project, the key technologies such as rapid excavation of earthwork , vertical barge at excavation outlet, subsection pouring of underground steel enclosure columns are innovated and applied to effectively guarantee the efficiency of reverse construction and control the deformation of foundation excavation during reverse construction. At the same time, the deformation data of diaphragm wall is analyzed, and combined with the analysis results, it is suggested that similar construction in the later stage can effectively reduce the deformation value of foundation excavation at the slope by encrypting the steel support in the slope top area.
作者 刘嘉东 董军业 赵晓娟 娄伟 汪胜 LIU Jiadong;DONG Junye;ZHAO Xiaojuan;LOU Wei;WANG Sheng(The First Company of China Eighth Engineering Division Co., Ltd., Ji'nan, Shandong 250000, China;China State Construction Overseas Development Co., Ltd. , Shanghai 200050, China)
出处 《施工技术》 CAS 2019年第13期4-6,32,共4页 Construction Technology
关键词 高层建筑 深基坑 逆作法 施工技术 变形 tall buildings deep foundation excavation top-down method construction deformation
  • 相关文献

参考文献3

二级参考文献18

共引文献77

同被引文献40

引证文献10

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部