摘要
以某机场高填方工程为例,对该不良地质形式,提出了“充填窑洞+开挖覆土+强夯”的处理方法,并总结了具体施工技术要点。开展了地基强夯处理试验,提出了强夯施工技术参数。对夯后地基进行了承载力和压实度指标评价,夯后地基的稳定性和密实度明显提高,满足各项设计要求。对强夯后的地基处理效果进行了试验检测,荷载试验、密实度试验和面波试验结果均表明,采用“充填窑洞+开挖覆土+强夯”工艺进行施工后,地基物理力学参数满足设计要求,地基处理取得了良好的效果。
This paper taken the bad geological form of a high fill project in an airport as an example, the treatment method of " filling cave + excavation and overburden + dynamic compaction" was put forward , and specific construction technology points were summarized. The dynamic compaction test of foundation was carried out, and the technical parameters of dynamic compaction were put forward. The bearing capacity and compaction index of the foundation after dynamic compaction were evaluated. After the dynamic compaction, the stability and density of the foundation are obviously improved to meet the design requirements. The effect of foundation treatment after dynamic compaction was tested. Load test, compaction test and surface wave test results show that under the technology of "filling cave + excavation and overburden + dynamic compaction" , the physical and mechanical parameters of foundation meet the design requirements, and the foundation treatment has achieved good results.
作者
周立新
皮进
李丽伟
段毅文
ZHOU Lixin;PI Jin;LI Liwei;DUAN Yiwen(Beijing Taisite Engineering Testing Co., Ltd., Beijing 102600, China;Zhongji North International Engineering Technology Co., Ltd. , Beijing 102442, China;China Institute of Waler Resources and Hydropower Research , Beijing 100038 , China;China Airport Road Engineering Technology Co., Ltd. , Beijing 100036, China)
出处
《施工技术》
CAS
2019年第13期54-56,共3页
Construction Technology
基金
国家自然科学基金(41772337)
关键词
地基
机场
高填方
边坡
人工窑洞
试验
foundations
airport
high fill
slope
artificial cave
tests