摘要
对水泥稳定碎石基层冬期施工现状进行阐述,从准备工作、参数设计工作、水泥稳定碎石摊铺施工、水泥稳定碎石养护工作等方面进行分析,并结合现场实际情况,针对施工流程提出有效解决方法,进而推动技术发展。
The present situation of the winter construction of the cement stabilized macadam base is described in this paper, from the preparation work, the design of the parameters, the paving and construction of the cement stabilized macadam, the maintenance of the cement stabilized macadam, etc., and in combination with the actual situation of the site, the effective solution to the construction process is put forward, and the technology development is further promoted.
作者
王博
Wang Bo(Shanxi Mechanization Construction Group Co., Ltd., Taiyuan 030009, China)
出处
《山西建筑》
2019年第14期65-66,共2页
Shanxi Architecture
关键词
民航机场
场道工程
水泥稳定碎石基层
冬期施工
civil aviation airport
field road engineering
cement stabilized macadam base
winter construction