摘要
对某选煤厂工程建设进行了简单的叙述,对其设计管理进行了详细的阐述,主要包括设计准备阶段设计管理、设计阶段设计管理、设计成果实施阶段设计管理、设计变更阶段设计管理等四个方面。选煤厂工程建设项目按设计工期完成,实现了较好的设计管理投资控制、进度控制、质量控制。可见设计管理在某煤矿选煤厂工程建设项目中发挥了较好的促进作用,实现了选煤厂工程建设项目的高效率、高质量、低投资、低风险目标。
This topic first gives a simple description of the engineering construction of a coal preparation plant, and then gives a detailed description of its design management, mainly including four aspects: design management in the design preparation stage, design management in the design stage, design management in the design achievement implementation stage, and design management in the design change stage. The construction project of the coal preparation plant was completed according to the design time limit, realizing better design management, investment control, schedule control and quality control. It can be seen that design management plays a better role in promoting the construction project of a coal preparation plant, realizing the goals of high efficiency, high quality, low investment and low risk of the construction project of the coal preparation plant.
作者
常振东
Chang Zhendong(Capital Construction Bureau, Shanxi Jincheng Anthracitemining Group Co., Ltd., Jincheng 048000, China)
出处
《山西建筑》
2019年第14期183-184,共2页
Shanxi Architecture
关键词
设计管理
选煤厂
质量控制
design management
coal preparation plant
quality control