摘要
介绍了目前我公司全钢载重一次法三鼓成型机的效率提升点,从工艺流程动作优化,设备自动化改造到人员操作效率提升等方面进行了论述,目的是在生产过程中降低不必要的时间损耗,从而使成型机设备效率发挥到最大,为公司创造更多的利润。
This paper introduces the efficiency improvement point of chaoyang company's all-steel load one-step three-drum building machine, from the aspects of process flow optimization, equipment automation transformation to personnel operation efficiency improvement. The goal is to reduce unnecessary time loss during the production process, thereby maximizing the efficiency of the building machine and creating more profit for the company.
作者
张波
斯力君
潘孟良
季徐庆
汪绪贤
Zhang Bo;Si Lijun;Pan Mengliang;Ji Xuqing;Wang Xuxian(Hangzhou Chaoyang Rubber Co. LTD.,Hangzhou 310018,Zhejiang,China)
出处
《橡塑技术与装备》
CAS
2019年第15期50-53,共4页
China Rubber/Plastics Technology and Equipment
关键词
成型机
步序优化
故障时间
效率提升
building machine
step optimization
failure time
efficiency improvement