摘要
介绍地质雷达在隧道二次衬砌检测中的基本原理,并结合工程案例,简要介绍地质雷达二衬质量检测的数据采集、处理、解译的基本流程;针对二衬中出现的脱空、不密实、厚度不足等质量问题,分析产生的原因并提出相应的处治措施。
This paper introduces the basic principle of ground penetrating radar (GPR) in the detection of secondary lining of tunnels.Combining with engineering cases,it briefly introduces the basic flow of data acquisition,processing and interpretation of the quality detection of secondary lining of GPR.Aiming at the quality problems of void,non-compactness and insufficient thickness in secondary lining,the causes are analyzed and the corresponding treatment measures are put forward.
作者
周明伟
ZHOU Mingwei(Jianyan Test Group Co.LTD.,Xiamen 361004)
出处
《福建建筑》
2019年第7期84-87,共4页
Fujian Architecture & Construction
关键词
地质雷达
隧道
衬砌质量
原因
处治
Ground penetrating radar (GPR)
Tunnels
Lining quality
Causes
Treatment