摘要
结合上海市松江区玉阳大道新建工程北泖泾桥主桥工程的施工过程,就下承式钢–混叠合梁简支系杆钢拱桥的施工工序和质量控制进行简要分析。
Based on the construction process of the main bridge project of Beimaojing Bridge in the new construction of Yuyang Avenue in Songjiang District. Shanghai, the construction process and quality control of the steel-architecture of the steel-mixed composite beam are briefly analyzed.
出处
《建筑技术开发》
2019年第12期61-63,共3页
Building Technology Development
关键词
简支系杆钢拱桥:施工工艺
质量控制
simple supported tie steel arch bridge
construction technology
quality control