摘要
援塞内加尔竞技摔跤场罩棚钢结构安装时采用临时支撑系统,施工阶段的临时支撑受力工况与结构设计使用受力工况不同,对罩棚钢结构卸载过程进行模拟与计算分析,制订卸载施工工艺、施工技术措施、检验监测方法,通过采用分阶段分级整体同步卸载,从而确保钢结构卸载平稳顺利。
The temporary support system is adopted for the installation of the steel structure of the sports wrestling shack in Senegal. The temporary support under the construction stage and the structural design are different. The simulation and calculation analysis of the unloading process of the shed steel structure is carried out. The construction technology, construction technical measures, inspection and monitoring methods, through the use of staged grading and overall synchronous unloading, to ensure smooth and smooth steel structure unloading.
出处
《建筑技术开发》
2019年第12期75-77,共3页
Building Technology Development
关键词
临时支撑
分级同步卸载
temporary support
hierarchical synchronous unloading