大型主题乐园预制化周转道路的应用

Application of Prefabricated Turnaround Roads in Large Theme Parks
下载PDF
导出
摘要 大型主题乐园往往占地空间大,施工周期长,场内施工道路复杂,施工道路受材料运输及设备吊装、管线开挖的影响,往往改动量较大且容易出现道路重复施工现象,采用混凝土预制化道路则更灵活机动,混凝土预制块铺面是由单个预制块体按照一定规则拼装而成的一种特殊路面结构,结合现场策划,加强现场管理,能有组织、有计划、有秩序地施工,以实现建设项目快速、优质、低耗。 Large-scale theme parks often occupy large space, long construction period, complicated construction roads, and construction roads are affected by material transportation, equipment hoisting and pipeline excavation, and often have large changes and are prone to repeated road construction. The concrete prefabricated road is more flexible and maneuverable. The concrete precast block pavement is a special pavement structure assembled by a single prefabricated block according to certain rules. Combined with onsite planning, strengthening on-site management, can be organized, planned, and Order construction in order to achieve rapid,high quality and low consumption of construction projects.
作者 张广彬 杨春安 涂修伟 张超 赵智磊 Zhang Guang-bin;Yang Chun-an;Tu Xiu-wei;Zhang Chao;Zhao Zhi-lei
出处 《建筑技术开发》 2019年第12期137-138,共2页 Building Technology Development
关键词 预制化道路 绿色施工 周转道路 prefabricated road green construction turnaround road
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部