摘要
针对目前公路隧道竖井衬砌施工滑模浇筑控制过程存在的问题,以实际工程项目为例,分析了滑模浇筑工序的控制现状,并提出了实践控制的方法策略,其目的是为相关建设者提供一些理论依据。结果表明,只有在明确公路隧道竖向衬砌施工要求与滑模浇筑要点的情况下,才能使工序控制措施的运用效果充分发挥出来。
In view of the problems existing in the control process of sliding form casting in highway tunnel lining construction, this paper takes the actual engineering project as an example to analyze the control status of the sliding form casting process, and proposes a practical control method strategy.The purpose is to correlate The builder provides some theoretical basis. The results show that the application effect of the process control measures can be fully exerted only when the requirements for vertical lining construction of highway tunnels and the key points of slipform casting are clarified.