基于能量法的船体分段翻身吊装方案优化设计方法 被引量:5

Optimized Design on Hull Block Turning Over Lifting Based on the Energy Method
下载PDF
导出
摘要 分段翻身吊装难度较大,风险较高,目前主要依靠人工经验设计吊装方案,较少有针对分段翻身的优化设计研究。首先对翻身过程中吊绳与相关船体构件的典型干涉问题做出干涉评估并提取干涉约束,结合吊点适应度约束确立若干吊点布置方案。然后以在翻身过程中结构的最大应变能最小为优化目标,得到最优吊点布置方案。最后使用结构分析软件验证最优方案的可靠性。 Hull block turning over lifting is of great difficulty and high risk. At present, the lifting scheme is mainly designed on designers’ experience, and there are little researches on the optimization design of the block turning over. Firstly, the interference evaluation of the typical interference between the ropes and hull structures during the turning process is made and the interference constraint is extracted. Several lifting point arrangement schemes are established in combination with the lifting point fitness constraints. Then, with the optimization objective of minimizing the overall strain energy of structure during the process of turning over, the optimal lifting points arrangement scheme is obtained. Finally, structural analysis software is used to verify the reliability of the optimal program.
作者 张帆 李瑞 刘玉君 韩小岗 ZHANG Fan;LI Rui;LIU Yiyun;HAN Xiaogang(School of Naval Architecture, Dalian University of Technology, Liaoning Dalian 116024, China;State Key Laboratory of Structural Analysis for Industrial Equipment, Liaoning Dalian 116024, China)
出处 《船舶工程》 CSCD 北大核心 2019年第5期54-59,共6页 Ship Engineering
基金 工信部高技术船舶科研计划支持项目 大连市科技创新基金项目(2018J12GX057)
关键词 船舶分段吊装 分段翻身 干涉评估 应变能 吊点布置 hull block lifting block turning over interfered assessment strain energy lifting points arrangement
  • 相关文献

参考文献5

二级参考文献26

  • 1徐升,张吉萍.大型船舶上层建筑整体吊装技术[J].中国水运(下半月),2010,10(12):147-148. 被引量:2
  • 2KIM H,LEE S S.A model for a simulation-based shipbuilding system in a shipyard manufacturing process[J].International Journal of Computer Integrated Manufacturing,2005,18(6):427-441.
  • 3LEE J K,LEE K J,PARK H K.Developing scheduling systems for Daewoo shipbuilding:DAS project[J].European Journal of Operational Research,1997,97(2):380-395.
  • 4纪卓尚.船体分段吊装参数的确定[J].中国造船,1984(2):86-94.
  • 5瑞典KOCKUMSComputer SystemAB公司.Tribon M3 User’s Guide[S].2004.
  • 6Q/DS2180-2010.船体分段吊装作业要求[s].
  • 7LI Rui, LIU Yujun, WANG Ji. Research on the intelligent de- sign method of block lifting in shipbuilding[ C ]/ /Proceedings of International Conference on Computer Applications in Ship building. London, UK:RINA, 2013, 2:183-188.
  • 8LEE J K, LEE K J, PARK H K. Developing scheduling sys- tems for Daewoo shipbuilding: DAS project E J J. European Journal of Operational Research, 1997, 97(2) : 380-395.
  • 9KIM H, LEE S S. A model for a simulation-based shipbuild- ing system in a shipyard manufacturing process[J]. Interna- tional Journal of Computer Integrated Manufacturing. 2005, 18 (6) :427-441.
  • 10MIURA Y. Development of "block lifting simulation system" with ship 3D-CAD model EC://Proeeedings of InternationalConference on Computer Applications in Shipbuilding. London, UK:RINA,2011, 1:151-155.

共引文献25

同被引文献25

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部