期刊文献+

某地新生界水源地勘察施工设计方案研究

下载PDF
导出
摘要 根据某县供水规划需求,本次新生界备用水源地勘察拟在城南进行,以松散层第二含水层(组)和第三含水层(组)上段为勘察目的层。采用电法勘察确定目的层段的富水区段,设计施工2个探采结合井,兼验证勘察孔。 According to the demand of water supply planning in a county,the investigation of the reserve water source in the Cenozoic is to be carried out in the south of the city,with the second aquifer(group)and the upper section of the third aquifer(group)as the exploration target layer.The rich water section of the target section is investigated and determined by electric method,two exploration-production combined wells are designed and constructed,and the exploration holes are verified.
出处 《科技创新与应用》 2019年第25期89-90,共2页 Technology Innovation and Application
关键词 新生界 水源地 勘察 探采结合井 Cenozoic water source exploration exploration-production combination well
  • 相关文献

参考文献3

二级参考文献22

共引文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部