摘要
深圳市于2016年将道路、桥梁、隧道景观艺术设计作为专篇纳入道路设计标准中,并于2017年年初开始道路景观艺术设计审查工作。梳理了深圳道路景观艺术设计相关指引要点,介绍了深圳市道路景观艺术设计审查的三阶段、审查要点的编制、专家审查的组织、设计讲评的开展以及专家评审意见的落实等相关情况,提出了深圳目前道路景观艺术设计存在“四个缺少”问题,以进一步提高道路景观艺术设计质量和设计水平。
In 2016,the landscape art design of road,bridge and tunnel was brought into the road design standard as a specialized article in Shenzhen,and the landscape art design review work of road was started at the beginning of 2017.This paper sorts out the relevant guiding essentials of landscape art design of roads in Shenzhen,introduces three stages of landscape art design review,the compilation of review essentials,the organization of expert review,the carrying out of design evaluation and the implementation of expert review opinions for the roads in Shenzhen,and puts forward the"four-missing"problem existing in the present landscape art design of roads in Shenzhen in order to further improve the landscape art design quality and level of roads.
出处
《城市道桥与防洪》
2019年第8期204-206,M0023,M0024,共5页
Urban Roads Bridges & Flood Control