政府投资项目超概算原因分析及对策研究 被引量:4

Analysis of the Cause of Over Budget Estimate of the Government Investment Projects and the Countermeasures
下载PDF
导出
摘要 就政府投资项目而言,前期决策、设计阶段存在较大的投资控制空间。论文结合实际,深入分析超概算的主观和客观原因,并从加强前期工作、加强施工管理、提高审批效能3方面提出了相应对策,以供参考。 As far as government investment projects are concerned,there ismore space for investment control in the pre-decision and design stages.This paper analyzes the subjective and objective reasons of the over budget estimate,and puts forward corresponding countermeasures from the three aspects of strengthening the previous work,strengthening the construction management,and improving the efficiency of the examination and approval,for reference.
作者 颜斌 YAN Bin(Shenzhen Construction Project Cost Management Station,Shenzhen 518031,China)
出处 《工程建设与设计》 2019年第14期218-219,共2页 Construction & Design for Engineering
关键词 政府投资项目 超概算 前期工作 合同管理 government investment projects over budget estimate priorwork contractmanagement
  • 相关文献

同被引文献10

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部