摘要
以青岛地铁一号线为研究对象,分析该项目成本管理中的问题,并提出改进措施,包括构建基于利益共同体的、多方协同的战略成本管理体系,分析影响安全、质量、进度的主要因素,寻求三者与成本之间的最佳结合点,采取作业成本管理与目标责任成本管理相结合的成本管理方法,建立事前、事中、事后、全员、全过程的动态环保成本管理体系。
Taking Qingdao metro line 1 as the research object,this paper analyzes the project cost management problems,and puts forward some suggestions for improvement,such as constructing a multi-party collaborative strategic cost management system based on interest community,analyzing the main factors affecting safety,quality and progress to seek the best combination point between the three and cost,adopting a cost management method combined activity cost management with target responsibility cost management,and establishing a dynamic environmental protection cost management system in the whole process of beforehand,process and afterwards.
作者
崔晓艳
张蛟
CUI Xiaoyan;ZHANG Jiao(Qingdao Huanghai University,Qingdao 266427,China;Qingdao Metro Group Co.,Ltd,Qingdao 266000,China)
出处
《建筑经济》
北大核心
2019年第8期90-93,共4页
Construction Economy
基金
2017年度青岛市社会科学规划研究项目(课题)“青岛市大型地铁隧道项目成本管理研究”(QDSKL1701189)
关键词
地铁项目
成本管理
环保成本
多方合作
metro project
cost management
environmental cost
multi-party cooperation