4Tang X Q, Wang B, Wang S C. Quality assurance model in mechanical assembly. The International Journal of Ad- vanced Manufacturing Technology, 2010, 51 ( 9 ): 1121-1138.
5Jamshidi J, Kayani A, Iravani P, et al. Manufacturing and assembly automation by integrated metrology systems for aircraft wing fabrication. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 2010, 224(1): 25-36.
6Maropoulos P G, Zhang D, Chapman P, et al. Key digital enterprise technology methods for large volume metrology and assembly integration. International Journal of Produc- tion Research. 2007, 45(7): 1539-1559.
7Muelaner J E, Kayani A, Martin O, et al. Measurement assisted assembly and the roadmap to part-to-part assem- bly. 7th International Conference on Digital Enterprise Technology. Bath: University of Bath, 2011:11-19.
8Cai B, Guo Y, Jamshidi J, et al. Large volume measura- bility analysis for early design. Proceedings of the Fifth International Conference on Digital Enterprise Tech- niques, 2008: 807-820.
9Muelaner J, Cai B, Maropoulos P G. Large volume me- trology instrument selection and measurability analysis. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 2010, 224(6) : 853-868.
10Maropoulos P G, Zhang D, Rolt S, et al. Integration of measurement planning with aggregate product modeling for spacecraft design and assembly. Proceedings of the In- stitution of Mechanical Engineers, Part B: Journal of En- gineering Manufacture, 2006, 220(10) : 1687-1695.